Record
Career by company, education and work records by year.
Career
2026.01 – present
로보톰 · robotic furniture manufacturer
SCM Division · Technician
Production engineering, purchasing and inventory
2024.09 – 2025.06
티지와이 · aluminum recycling and remelting
Production engineering · Senior researcher
넥스코 → 티지와이 · one employment, company renamed
Rotary-furnace field-problem analysis, PLC/HMI signal verification, MES integration checks, raw-material blending and production history
2020.01 – 2020.03
한림금속
Process-improvement consulting · Freelance
Production-flow, bottleneck and defect-cause analysis; work-path improvement proposals and a standard work manual
2016.11 – 2019.08
TheBest → 성환판넬 · metal panel manufacturer
Production control · Staff → Assistant manager
CAM, G-code, CNC cutting and bending; weekly production planning, material requirements, ordering and inventory
Education
2018.03 – 2022.02
한국공학대학교 · university
Graduated, Department of Mechanical Manufacturing Engineering
Work records
Record for 2026
Production operations standardization and work-management system built and function-tested
7 process stages and 11 shipment conditions (8 judged by formula) · work-management web, weekly Slack reports and near-deadline alerts · 46-page operating standard and 8 forms
Production operations standardization & work-management system
AI PO calculation and manufacturing-operations data structure designed
16 business areas · read-only AI agent · equipment, WMS and MES expansion design · 98-page system design standard
PO automation & AX ERP development
53 tests of the control-sequence Python model passed
Assembly sequence and evidence conditions 16 · operating modes and transitions 9 · alarm and recovery 18 · maintenance reverse motion and no-replay 10 · changed CAD assembly integration, PLC and physical cell in later verification
Drive-wheel assembly cell design & control-logic verification
1 unassemblable case found in the CAD assemblability review
Snap-ring pre-fit interference → coupling sub-assembly layout change drawn up
Drive-wheel assembly cell design & control-logic verification
AX ERP inventory lookup, PO approval and PDF generation built
React, Next.js, API, PostgreSQL · BOM of 85 parts · approval and PDF tested in the development environment
PO automation & AX ERP development
Digital-twin environment built
CAD-based virtual process and equipment layout · CAD → USD conversion
Drive-wheel assembly cell design & control-logic verification
AI and n8n PO automation · documents and e-mail tested for 6 suppliers
Shortfall calculation, PDF in the company form, e-mail per supplier · manual steps 20 → 3 (6 suppliers) · my own test inbox
PO automation & AX ERP development
Record for 2024
Rotary-furnace equipment verification, process history and blend judgment
Position, temperature and gas-flow check items · XG5000 communication and ladder compared with HMI signals · blend judgment before charging · 20 per-material records
Rotary furnace process improvement & equipment verification · 2024 – 2025
Title history
From process design to building manufacturing systems
since 2026.10
Processes that run the same, whoever runs them
2026.10 · earlier title
For more material, please ask by e-mail.
fpdlsdk3115@gmail.com