Field problems improved through measurement and process control

Period: 2024.09 – 2025.06Stage: Field application and results

Project
Rotary furnace process improvement & equipment verification
Company
티지와이aluminum recycling and remelting
Scope
Results before and after equipment introductionprocess records kept
  • Door and tilt overload

    Limit sensors · position-limit signals checked ⁠·⁠ Field photo
  • Duct overheating and flashback

    Duct temperature sensor · temperature display and warning checked ⁠·⁠ Field photo
  • Operating conditions hard to see

    Atmosphere temperature and gas flow · live and totalized values checked ⁠·⁠ Field photo

Field problem → measurement and control item → HMI display and real-motion check

PLC and HMI checked against real equipment motion

Position, temperature and flow signals verified; operating state and per-material production history managed

Equipment verification & process data

Equipment verification, process history and blend criteria were connected, laying the basis for higher recovery and a traceable production process.

Key results and improvements

IndicatorResultBasis
Recovery improvementBefore and after equipment introduction73%  to 85% averageUp 12 ppaverage after introduction
Production transparencyMaterial, process and quality historyProduction process tracedRaw material, temperature, composition and recovery linked
Blend controlWhen composition is checkedAnalysis after melting  to Blend reviewed before chargingExpected composition computed and judged against criteria

Challenge

  • Door and tilt overload, duct overheating and flashback risk
  • Operation that relied on operators' feel, and recovery rates that varied by raw material
  • Signal verification and blend-judgment criteria were needed for the new equipment

Work carried out

  1. Field problems and check items

    Door and tilt position, duct and atmosphere temperature, gas flow checked

  2. PLC and HMI signal comparison

    XG5000 communication and ladder checked against real equipment motion and the HMI display

  3. Process data and integration conditions

    Raw material, temperature, composition and recovery managed; MES integration checked

  4. Blend judgment before charging

    Expected composition computed from raw-material composition and blend ratio, then judged against criteria

Design decisions

  • Field risks turned into concrete check items for position, temperature and flow
  • Operating state and raw-material conditions recorded together as a basis for process judgment
Scope of work
  • End to end on my own · field-problem analysis, equipment verification
  • Process-history and blend-judgment design, development and documentation
Coordination
  • Reviewed signal and integration conditions with the equipment contractor
  • Daily TBM (toolbox meeting) with 7 operators
Applied skills
  • XG5000
  • PLC/HMI
  • MES
  • Excel

Equipment verification & process data

Operating state linked to blend and recovery history

73% → 85% average

Recovery up 12 pp, before vs. after equipment introduction

Links the field result with the history kept for raw material and operating conditions

Equipment state · PLC/HMI

Real equipment motion compared with HMI display and warnings ⁠·⁠ Field photo
Position
Door-closed and lowered limits
Temperature
Exhaust and atmosphere temperature
Flow
Instantaneous and totalized gas flow

Field verification items

  • XG5000 communication and ladder check
  • Equipment motion compared with HMI signals
  • MES integration items and conditions reviewed

Basis for process judgment · history and blend

20 per-material records · 2024.10.26 – 2025.05.09 · raw-material and supplier cells withheld ⁠·⁠ Work sheet

Labels on the sheet

날짜
date
원료
raw material
공급처
supplier
평균온도
average temperature
원료투입평균온도
average charging temperature
회수율
recovery rate

The 20-⁠row table is the trace record of raw material, temperature, composition and recovery; it is separate from the before/after average recovery tally.

Expected composition computed and judged against criteria before charging · raw-material cells withheld ⁠·⁠ Work sheet

Labels on the sheet

원료
raw material
배합비율
blend ratio
합부판정
pass/fail judgment
화학적 성분
element
배합성분
blended composition
성분 기준 적합 여부
within the composition criteria
적합
acceptable
해당없음
not applicable

Error against measured composition for this blend example is left to later verification

  1. Before charging · blend judgment

    Material composition × blend ratio → expected composition, judged against criteria

  2. During operation · state check

    Position, temperature, flow → compared with HMI display and warnings

  3. After melting · result tracing

    Material, temperature, composition, recovery → history by condition

Disclosure scope Field photo 4 · Work sheet 2. The photos show the rotary furnace and its HMI screen; the record table's raw-material and supplier cells and the blend sheet's raw-material cells are blank. The duct photo's red mark is in the original.